Product Information
Remanufactured Specifications
This equipment will be remanufactured in accordance with our standard specifications which includes the following procedures.
PREPARATION
- All surfaces (inside and out) to include stator, end bells, rotating assemblies, and parts will be cleaned
- All parts will be fully inspected and tested where applicable.
ELECTRICAL and MECHANICAL
- Stator windings will undergo the following tests in accordance with NEMA standards
- Simulated D.C. Hi-Potential test
- Coil Surge Test
- Polarization Index Test
- Rotating assemblies will undergo the following tests
- Tested for Soundness
- Checked and brought to concentricity
- Shaft runouts brought to proper tolerances
- Dynamically balanced (fans balanced seperately on TEFC)
- All mechanical fits will be brought to proper tolerances.
- All ball bearing units will have new bearings
- All sleeve bearing clearances will be brought to proper tolerances.
FINAL ASSEMBLY and TEST PROCEDURES
- Full-voltage test run
- Full-spectrum vibration analysis
- Phase balance, starting and unloaded amperage checks, winding and bearing temperature checks
- Shaft runout checks
- Magnetic center scribed on sleeve bearing units
COMPLETION
- All units will be shipped without oil and tagged
- All sleeve bearing shafts will be blocked
WARRANTY
- A One Year Warranty will be extended from the date of shipment as per our standard terms and conditions.